You
don't need the line INCLUDE Z80.POD until we figure out the Z80QT, as that
activates the features as far as I know...Add a
!DATE LAST MODIFIED
Points taken & added.
Thanks.
at the top, you loose sight of which edits work otherwise, the switch
test in the GALAGA script works fine by the way, clip and edit it...plus you
need to create some error message routines. The examples, again in Galaga.s
work as a good template.
Well if you want to talk speed isn't it
faster to check all on, all off & then set the game up for factor settings
(or do you return customer boards with the same settings as recieved)? I
think that is what I'll write my DIPs to do. How can a customer argue with
Factory settings?
I was going to get a student to type in the Guided
Fault programs in the next week or two...That is also a template for building
programs. Does everyone know what I am talking about or do I need to scan in
another book? The title is:
Application Information B0138 How to Use
the 9010A for Guided Fault Isolation.
I suspect it needs to be
scanned in...20 pages. Unfortunately my text recognition software (ISIS) can't
figure out the Dot Matrix type that was used for the program
listing...
Don't think I have that document either John.
Thanks,
Kev